(IT SOLUTIONS / 02) Structured Cabling

Your network is
only as good as
the cable.

Standards-compliant structured cabling for offices, warehouses and fit-outs across the UAE. Designed, installed, labelled and certified so the next decade of upgrades just plugs in.

  • Cat6 / Cat6A copper
  • Fibre optic backbone
  • Rack & patch design
  • Custom office layouts
  • Testing & certification
Book a site survey Site visit booked within 2 working days. We reply in one business day.
IT SOLUTIONS · AL KARAMA · DUBAI · UAE
(02) What we run

Copper, fibre,
and the discipline.

Voice, data and video over one organised infrastructure. Every run tested, every port labelled, every drawing handed over.

Cat6 / Cat6A copper

Horizontal cabling engineered for clean terminations and full gigabit-plus performance at every outlet.

Fibre optic backbone

High-capacity fibre for risers, buildings and long runs. Spliced, tested and documented.

Rack & patch design

Cabinets, patch panels and cable management planned so moves, adds and changes take minutes.

Custom office layouts

Outlet plans built around your floor plan and headcount, including the desks you'll add next year.

Testing & certification

Every link tested and certified against international standards, with results in your handover pack.

Voice, data, CCTV & AV

One structured system carrying phones, network, cameras and screens. No spaghetti, no mystery cables.

(03) How a job runs

Survey to
certificate.

5 steps
01

Site survey

Walk the space, count the drops, find the risers. Design starts from the building, not a template.

02

Design

Cable schedule, containment routes, rack elevations and outlet plan, all approved before a single tray goes up.

03

Install

Clean runs, proper containment, tidy terminations. We work around fit-out schedules and after hours where needed.

04

Test & label

Every link certified, every port labelled to a schedule that matches the drawings.

05

Handover

As-built drawings, test results, and a warranty. The next contractor will thank you.

(04) Why Najaha

Built for the
next tenant fit-out.

i

Standards first.

Designed and certified to international cabling standards and UAE regulations, because "it works" isn't a test result.

ii

Future-ready.

Capacity and pathways planned for expansion, so adding a floor doesn't mean re-pulling a building.

iii

Any system, one plant.

Phones, Wi-Fi APs, CCTV, access control and AV all ride the same organised infrastructure.

iv

Documentation habit.

Labelled ports, as-built drawings, test reports. Handover packs your facilities team will actually use.

The other half of the job

The same team also handles the work your customers actually see.

(06) Fitting out or fixing up

Start with the
foundation.

WhatsApp Call now Brief us